Structural, civil & electro-mechanical projects

 

•    Materials supply and construction of 115 tons of structural steel for pipe racks and operation platforms within the Cryoinfra Plant to service Du Pont Plant in Altamira. Project included sand-blasting and painting. Altamira, Mex., 1988.

 

•    Materials supply and construction of 40 tons of tubular steel for dock walk-ways located at the Altamira Port to service Industrias Negromex. Project included sand-blasting and painting. Altamira, Mex., 1991.

 

•    Materials supply and construction of 140 tons of structural steel for a building structure located at Industrias Negromex. Project included sand-blasting, painting, 2400 sq. meters of roofing material and 640 cu. meters of reinforced concrete. Altamira, Mex., 1993.

 

•    Materials supply and construction of 360 tons of structural steel for pipe racks, operation platforms and a building structure located within Industrias Negromex. Project included sand-blasting and painting. Altamira, Mex., 1993.

 

•    Materials supply and construction of 140 tons of structural steel for pipe racks, operation platforms and a building structure located within Industrias Negromex. Project included sand-blasting and painting. Altamira, Mex., 1994.

 

•    Materials supply and construction of an effluent-water treatment plant located within the Finacril Plant. Project included 15 tons of structural steel for pipe racks, sand-blasting, painting, 1,100 cu. meters of reinforced concrete, electro-mechanical work, process-control instrumentation, electrical sub-station & power distribution as well as both steel & non-metallic piping. Altamira, Mex., 1994.

 

•    Materials supply and construction of 52 tons of structural steel for pipe racks located at the Petrocel Plant. Project included sand-blasting, painting, and reinforced concrete for foundations. Altamira, Mex., 1995.

 

•    Materials supply and construction of 35 tons of structural steel for operation platforms located at the Industrias Negromex Plant. Project included sand-blasting, painting, and reinforced concrete for foundations. Altamira, Mex., 1995.

 

•    Materials supply and construction of a natural-gas Gathering Station Corindon 3-A for Pemex. Project included civil-site plan, reinforced concrete for foundations & tank over-spill basins, steel tanks, structural steel for pipe racks and operation platforms, steel piping, instrumentation and process equipments (gas separators, burners, shut-down valves, etc.). Pemex Reynosa District, Laredo, Mex., 1997.

 

•    Materials supply and construction of a natural-gas Gathering Station Corindon 2-A for Pemex. Project included civil-site plan, reinforced concrete for foundations & tank over-spill basins, steel tanks, structural steel for pipe racks and operation platforms, steel piping, instrumentation and process equipments (gas separators, burners, shut-down valves, etc.). Pemex Reynosa District, Laredo, Mex., 1997.

 

•    Materials supply and construction of a natural-gas Gathering Station Culebra Norte (Phase 2) for Pemex. Project included civil-site plan, reinforced concrete for foundations & tank over-spill basins, steel tanks, structural steel for pipe racks and operation platforms, steel piping, instrumentation and process equipments (gas separators, burners, shut-down valves, etc.). Pemex Reynosa District, Peña Blanca, Mex., 1998.

 

•    Materials supply and construction of 6 (six) natural-gas Gathering Stations at Cuatro Milpas, Gruñon, Velero and other gas fields. Project included civil-site plan, reinforced concrete for foundations & tank over-spill basins, steel tanks, structural steel for pipe racks and operation platforms, steel piping, instrumentation and process equipments (gas separators, burners, shut-down valves, etc.). Pemex Reynosa District, Reynosa, Mex., 2004.

 

•    Materials supply and construction (second phase) of a natural-gas Main Gathering & Measure Station (Estación de Medición KM-19). Project included civil-site plan, reinforced concrete for foundations & tank over-spill basins, steel tanks (3,000, 5,000 and 20,000 barrels), structural steel for pipe racks and operation platforms, steel piping, instrumentation and process equipments (gas separators, two 150 ft. aprox. elevated burners, shut-down valves, etc.). Pemex Reynosa District, Reynosa, Mex., 2007.

 

•    Engineering design, materials supply, construction and testing of a 10,000 barrels crude oil storage steel tank. Project includes civil-site plan, reinforced concrete for foundation & tank over-spill basin, cathodic protection, sand blasting & painting and steel piping; located at Pemex Altamira District-Ebano Oilfield, Mex., 2013.